• Home
  • news
  • features
  • interviews
  • projects
  • topics
    • sustainability
    • short courses
    • emerging markets
    • technology
    • restoration
    • renovation
    • new golf courses
  • magazine
    • Latest issue
    • Back issues
    • Advertise
  • golf directory
Search
GCA Logo
Sean Dudley / 15 January 2018
/ Categories: News

Golf Club Lignano introduces EcoBunker’s Aquaedge solution

A project to introduce EcoBunker’s Aquaedge solution at Golf Club Lignano on Italy’s Adriatic Coast is progressing well.

The course at Lignano was designed by Marco Croze and opened in the early 1990s. Over time however, the timber retaining walls that bordered the course’s water hazards needed replacing due to wear and tear.

After reading about EcoBunker’s Aquaedge solution in Golf Course Architecture magazine, the club’s director of golf Fabrizio Bertoli spoke to the company with a view to potentially installing Aquaedge at Lignano.

“The timber edgings, which were over 25 years old, were rotting, and the weak clay/silt soils – which were dredged from a nearby marina to raise ground levels during construction – exerted considerable pressure, causing the walls to start failing,” explained Richard Allen, founder and director of Ecobunker. “They represented a significant safety and aesthetic problem.”

A team from EcoBunker installed a 50 metre trial length of Aquaedge along the front of the tenth green. This took just four days to complete, and was very well received by the club.

The club took the decision to commit to a larger implementation project, which is now underway. This will see the Aquaedge solution put in place at numerous locations throughout the course, and will take place over the first few months of 2018.

“The second phase comprises a cumulative 350 metres of Aquaedge,” Allen explained. “Some of this requires construction in deeper water, up to 1.5m at the margin. As with most civil engineering design challenges I’ve encountered, an ‘off the shelf’ solution is not the best approach. I designed a special detail for these deeper wall sections, which has added extra stability within an affordable budget.”

Previous Article What does the future of golf course architecture hold?
Next Article Renovations get underway at Forest Creek Golf Club in Texas
Print
5548 Rate this article:
No rating
Tags: Renovation
Slideshow HTML
  • Lovely Golf Course

    The project’s second phase is now underway

  • Lovely Golf Course

    In the first phase, a 50 metre trial length of Aquaedge was added in front of the tenth hole

Sean Dudley

Sean DudleySean Dudley

Other posts by Sean Dudley
Contact author

Contact author

Message sent.
Please enter your name. Please enter your name.
Please enter a valid email address. Please enter a valid email address. Please enter your email.
Please enter a subject Please enter a subject
Please enter the message.
x
  • Articles
  • News
  • Features
  • Interviews
  • Opinion
  • On site
  • News
  • Topics
  • New Golf Courses
  • Renovations
  • Sustainability
  • Emerging Markets
  • Technology
  • Magazine
  • Print
  • Digital
  • Golf Directory
  • About Us
  • About Us
  • Contact Us
  • Advertise
  • Newsletter
  • Gopher Watch
  • Contact us
  • Login
  • Terms of use
  • Privacy policy
  • Cookie policy
Golf Course Architecture is published by Tudor Rose. Learn more.
Copyright © 2025 Tudor Rose. All rights reserved.
Tudor Rose logo