• Home
  • news
  • features
  • interviews
  • projects
  • topics
    • sustainability
    • short courses
    • emerging markets
    • technology
    • restoration
    • renovation
    • new golf courses
  • magazine
    • Latest issue
    • Back issues
    • Advertise
  • golf directory
Search
GCA Logo
Toby Ingleton / 25 October 2018
/ Categories: News

Harradine redesigns three opening holes at Jebel Ali

The golf course at the JA Jebel Ali Beach Hotel in Dubai has reopened following Harradine Golf’s redesign of the first three holes.

The work, which was required due to the construction of a new hotel at the northeast corner of the resort’s grounds, sees the opening holes start with a par four-four-three configuration in place of the original five-three-four.

“The redesign includes new tees and the lengthening of the driving range to a total of 388 yards, thus making it possible to be played from both ends,” said Peter Harradine. “The second hole is a 331-yard slight dogleg to the right over some trees and is a theoretical driveable par four. However, landing on the green with the drive is not for the faint-hearted as it is defended by a bunker on the front right corner and a new lake on the left-hand side.”

The course close for construction on 20 May and reopened on 23 September, leaving just two-and-a-half months for grow-in. “Quite an achievement!” said Harradine.

Jebel Ali was originally designed by Harradine and opened in 1995. Deer and peacocks roam the nine-hole course, which has hosted the Omega Dubai Desert Classic Challenge Match, a one-day charity contest before the European Tour event.

“The new holes were designed to provide an attractive view from the new hotel and we are sure that many guests will either want to play or try the game as they observe the course and players from their vantage point,” said Harradine. “We also provided tees on the hotel side of the driving range in order to further entice guests to this great game!

“740 new trees and shrubs and 1,600 tall grasses were planted to ensure that the new holes retain the original character of the course, which already featured many mature trees. The maintenance team took the opportunity of the closure to drastically renovate holes four to nine and we hope that the new holes will not disappoint the regulars.”

Previous Article Cervone collaborates with Rocco Mediate for alterations at Greensburg
Next Article Sun City Hilton Head completes renovation of Argent Lakes course
Print
5818 Rate this article:
No rating
Tags: RenovationEmerging markets
Slideshow HTML
  • Greensburg

    The Jebel Ali golf course in Dubai has reopened following Harradine Golf’s redesign of its first three holes

  • Greensburg

    The work was required due to the construction of a new hotel

  • Greensburg

    At 331 yards, the new second hole is a ‘theoretical’ driveable par four

  • Greensburg

    The new par-three third hole

Toby Ingleton

Toby IngletonToby Ingleton

Other posts by Toby Ingleton
Contact author

Contact author

Message sent.
Please enter your name. Please enter your name.
Please enter a valid email address. Please enter a valid email address. Please enter your email.
Please enter a subject Please enter a subject
Please enter the message.
x
  • Articles
  • News
  • Features
  • Interviews
  • Opinion
  • On site
  • News
  • Topics
  • New Golf Courses
  • Renovations
  • Sustainability
  • Emerging Markets
  • Technology
  • Magazine
  • Print
  • Digital
  • Golf Directory
  • About Us
  • About Us
  • Contact Us
  • Advertise
  • Newsletter
  • Gopher Watch
  • Contact us
  • Login
  • Terms of use
  • Privacy policy
  • Cookie policy
Golf Course Architecture is published by Tudor Rose. Learn more.
Copyright © 2025 Tudor Rose. All rights reserved.
Tudor Rose logo