• Home
  • news
  • features
  • interviews
  • projects
  • topics
    • sustainability
    • short courses
    • emerging markets
    • technology
    • restoration
    • renovation
    • new golf courses
  • magazine
    • Latest issue
    • Back issues
    • Advertise
  • golf directory
Search
GCA Logo
Richard Humphreys / 21 January 2021
/ Categories: News

Third nine by IMG opens at Hilltop Valley in Vietnam

Hilltop Valley Golf Club in Hoa Binh, Vietnam, has opened a third nine designed by IMG.

The club’s first 18 holes, also designed by IMG, officially opened for play in September 2019. Work on holes 19-27 started in 2018 with construction completed in October 2020. Brit Stenson did the design work for IMG.

“It is an extremely hilly site with dramatic changes in elevation throughout the course, particularly on holes 10-27,” said Paul Burley, senior vice president, IMG Golf Course Services. “The front nine is flatter and plays through a river valley.

“Many holes are bordered by trees, thick vegetation, steep hills and water, with a minimal amount of rough. The course requires accuracy off the tee in order to avoid the trouble, and to set up an approach shot from an optimal position.”

The new nine measures 3,574 yards from the back tees, joining the existing 18 holes of 6,908 yards.

“The twenty-fourth hole is a terrific par five that plays along a ridgeline and has magnificent views across the property, particularly from the green complex,” said Burley. “With trouble on both sides of the fairway, this hole demands accuracy throughout. The big hitters could possibly reach the green in two, but it’s very risky given the trouble that awaits on either side of the hole and around the green complex.

“Hole 27 is a good finish to this nine and a birdie opportunity. It’s a downhill par four doglegging left, measuring 420 yards from the back tees, but plays much less given the elevation change from the tee to the fairway. It is another hole that provides stunning views from the tee complex.”

IMG ensured progress continued on the project during the pandemic via the use of photos, videos and conference calls with the construction team. “From March 2020, there was daily interaction for many months to ensure plans and specifications were followed,” said Burley.

IMG is currently in the design phase for four new projects in Vietnam.

Previous Article Palmer team to begin Teton Pines renovation project in April
Next Article Course work to begin on ‘incredible’ Seven Mile Beach site in Hobart
Print
4722 Rate this article:
No rating
Tags: New golf courseEmerging marketsNews
Slideshow HTML
  • Hilltop
    IMG

    A third nine by IMG has joined Hilltop Valley’s existing 18 holes (pictured)

  • Hilltop
    IMG

    “It is an extremely hilly site with dramatic changes in elevation throughout the course, particularly on holes 10-27,” says Paul Burley

ADd Image Credit here for home page
IMG
Richard Humphreys

Richard HumphreysRichard Humphreys

Other posts by Richard Humphreys
Contact author

Contact author

Message sent.
Please enter your name. Please enter your name.
Please enter a valid email address. Please enter a valid email address. Please enter your email.
Please enter a subject Please enter a subject
Please enter the message.
x
  • Articles
  • News
  • Features
  • Interviews
  • Opinion
  • On site
  • News
  • Topics
  • New Golf Courses
  • Renovations
  • Sustainability
  • Emerging Markets
  • Technology
  • Magazine
  • Print
  • Digital
  • Golf Directory
  • About Us
  • About Us
  • Contact Us
  • Advertise
  • Newsletter
  • Gopher Watch
  • Contact us
  • Login
  • Terms of use
  • Privacy policy
  • Cookie policy
Golf Course Architecture is published by Tudor Rose. Learn more.
Copyright © 2025 Tudor Rose. All rights reserved.
Tudor Rose logo